Commitment · 62c51f66-f146-4ef2-aaa2-9b374e5418e8
Each active site shall conduct a full emergency evacuation drill at minimum every six months, with participation recorded and lessons actioned within 14 days.
Project: Musica Tower · Musica Tower Pty Ltd
UnverifiedcriticalISO 45001
Last verified 22 May 2026, 05:15 am
Confidence
0%
Evidence freshness
freshthreshold 180d
197 days since supporting evidence
Owner
Unassigned
Verdict rationale
Cached against the commitment + top-20 evidence candidates.
Seed verdict: unverified with confidence 0
Supporting evidence
Top 1 retrieved after hybrid + rerank. Every citation resolves to an exact page in the original document.
- Doc 1dfce898 · p. 4relevance 58%
“Plant inspection March 2026 — emergency egress drill referenced as 'next scheduled May'. Last drill at MT-024 logged 2025-10-04 (>197 days).”
Inspection·22 May 2026
Source — commitment text
The paragraph in the IMS / PMP / Policy that created this commitment.
“”
Doc d8febc17 · p. 78ISO 45001 §8.2
Timeline
Every verdict emitted against this commitment.
- Re-verified — 22 May 2026, 05:15 amverdict = unverified · confidence 0%
- Previous sweep · verdict = unverified7 days earlier
- First extracted from source documentduring initial full-corpus sweep (2026-02)