Implementation Audit
Priorities

What needs fixing.

Every commitment at risk of failing an audit, sorted by urgency. Click a row to see the evidence gap and the one action that closes it.

Open high-risk commitments
5
ranked below
Contradicted
2
framework says X; field says not-X
Days to next audit
0
Rhodes Waterside Stage 4
Evidence coverage
25%
2 of 8 commitments verified
6 of 6

Implementation Audit — Exception-to-Evidence

One-click actions on every row. Click a commitment to preview the evidence pack on the right.

6 open
UrgencyCommitmentVerdictProjectOwnerLast evidence seenAction
100
critical
Each active site shall conduct a full emergency evacuation drill at minimum every six months, with participation recorded and lessons actioned within 14 days.
ISO 45001 §8.2
UnverifiedMusica Towernever
100
critical
Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.
ISO 45001 §8.1.3
ContradictedNorth Connex Tunnel Finishingnever
90
critical
All Safe Work Method Statements (SWMS) for high-risk construction work will be signed off by a competent person before work commences, and reviewed when conditions change.
ISO 45001 §8.1.2ISO 45001 §8.1.3WHS Reg §299
PartialMusica Towernever
80
high
Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved by the HSEQ Manager.
ISO 9001 §10.2
ContradictedNorth Connex Tunnel Finishingnever
70
high
Workplace environmental incidents shall be reported within 24 hours of identification, with a root-cause analysis submitted within 5 business days.
ISO 14001 §6.1.1ISO 14001 §9.1.1
PartialCorporatenever
51
medium
All structural and finishing timber shall be FSC Chain-of-Custody certified; certificates retained per product and available on request.
FSC-STD-40-004 §2.3
PartialMusica Towernever

Evidence pack

Commitment 3cce2ce8-b24a-4a15-9877-369b45aed88f

Contradicted
Commitment text

Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved by the HSEQ Manager.

Doc a13ce64e · p. 67ISO 9001 §10.2
Verdict confidence93%
Evidence freshness
freshthreshold 180d
197 days since supporting evidence
Framework vs field
critical
Framework says

Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved.

Doc · p. 38
Field evidence says

NCR register shows NCR-0038 at 74 days, NCR-0039 at 62 days, NCR-0041 at 39 days — all without logged extensions.

Doc · p. 122 May 2026
Why: Three NCRs exceed the 30-day close threshold with no approved extension on record. Pattern-level breach of ISO 9001 §10.2.
Verdict rationale
Seed verdict: contradicted with confidence 0.93
Open full detail
Sweep status
ingest
classify
extract
retrieve
verify
Last full sweep complete · 02:45 AEST · 147,204 pages · $108 AUD · 14 new findings