Contradictions
Compliance · Contradictions

Committed policy vs. field evidence.

Where what your IMS says should happen and what the evidence shows actually happened don't match. Resolve these before your next audit.

Open
4
Critical
4
Resolved this week
0
4 findings
critical

Three NCRs exceed the 30-day close threshold with no approved extension on record. Pattern-level breach of ISO 9001 §10.2.

North Connex Tunnel Finishing — Zone D22 May 2026

Framework says

Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved.

Doc · p. 38

Field evidence says

NCR register shows NCR-0038 at 74 days, NCR-0039 at 62 days, NCR-0041 at 39 days — all without logged extensions.

Doc · p. 122 May

Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved by the HSEQ Manager.

critical

PMP §8.1.3 requires CC-04 form + worker consultation for any SWMS change during execution. NCR 0042 documents a change made without either control.

North Connex Tunnel Finishing — Zone D22 May 2026

Framework says

Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.

Doc · p. 38

Field evidence says

NCR 0042 records: SWMS-Demo-Lot14 revised by site supervisor without CC-04 form, workers not re-briefed before work resumed on 2026-04-16.

Doc · p. 122 May

Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.

critical

Three NCRs exceed the 30-day close threshold with no approved extension on record. Pattern-level breach of ISO 9001 §10.2.

North Connex Tunnel Finishing — Zone D22 May 2026

Framework says

Corrective actions arising from Non-Conformance Reports (NCRs) shall be closed within 30 days unless a formal extension is approved.

Doc · p. 38

Field evidence says

NCR register shows NCR-0038 at 74 days, NCR-0039 at 62 days, NCR-0041 at 39 days — all without logged extensions.

Doc · p. 122 May
critical

PMP §8.1.3 requires CC-04 form + worker consultation for any SWMS change during execution. NCR 0042 documents a change made without either control.

North Connex Tunnel Finishing — Zone D22 May 2026

Framework says

Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.

Doc · p. 38

Field evidence says

NCR 0042 records: SWMS-Demo-Lot14 revised by site supervisor without CC-04 form, workers not re-briefed before work resumed on 2026-04-16.

Doc · p. 122 May