Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.
Project: North Connex Tunnel Finishing — Zone D · Transurban
Contradiction — framework vs field
The product flagged this because two sources disagree. Both citations are exact-page and clickable.
“Changes to SWMS during execution shall be captured through the change control form, consulted with workers carrying out the work, and re-issued before the revised work proceeds.”
“NCR 0042 records: SWMS-Demo-Lot14 revised by site supervisor without CC-04 form, workers not re-briefed before work resumed on 2026-04-16.”
Verdict rationale
Cached against the commitment + top-20 evidence candidates.
Supporting evidence
Top 1 retrieved after hybrid + rerank. Every citation resolves to an exact page in the original document.
- Doc 045ea5f5 · p. 1relevance 97%
“NCR 0042: SWMS-Demo-Lot14 amended on-site by supervisor C. Walpole 2026-04-16; CC-04 change-control form not raised. Workers resumed work without re-brief.”
NCR·22 May 2026
Source — commitment text
The paragraph in the IMS / PMP / Policy that created this commitment.
“”
Timeline
Every verdict emitted against this commitment.
- Re-verified — 22 May 2026, 05:15 amverdict = contradicted · confidence 96%
- Previous sweep · verdict = contradicted7 days earlier
- First extracted from source documentduring initial full-corpus sweep (2026-02)