MT-024 · AS 4902
Musica Tower
Musica Tower Pty Ltd · Principal contractor: Alvent Group · $58.4M
Project health
25/ 100
1
Verified
2
Partial
1
Unverified
0
Contradicted
Location
Parramatta, NSW
Start → End
01 July 2024 → 14 Mar 2027
Days to next audit
0 days
Value
$58.4M
Standards
ISO 45001 · ISO 14001 · ISO 9001 · FSC CoC
Team
— (PM) · — (HSEQ)
Commitments on this project
Verdicts refreshed on every sweep. Click a row for full evidence pack.
PartialUnverifiedPartialVerified
All structural and finishing timber shall be FSC Chain-of-Custody certified; certificates retained per product and available on request.
FSC-STD-40-004 §2.3confidence 65% · fresh 6d
Each active site shall conduct a full emergency evacuation drill at minimum every six months, with participation recorded and lessons actioned within 14 days.
ISO 45001 §8.2confidence 0% · fresh 197d
All Safe Work Method Statements (SWMS) for high-risk construction work will be signed off by a competent person before work commences, and reviewed when conditions change.
ISO 45001 §8.1.2ISO 45001 §8.1.3confidence 71% · fresh 6d
Weekly toolbox talks will be conducted on each active site, covering current hazards and safe work procedures, attended by all site workers, with attendance recorded.
ISO 45001 §7.4ISO 45001 §8.1.2confidence 92% · fresh 4d
Top exceptions
Ordered by audit risk
Documents ingested (4)
Live feed from SharePoint + Procore + Email
- Doc d8febc17 · p. 1Project Management Plan — Musica Tower MT-024PMP · manual · 142 pp · —
- Doc 0a7d27bb · p. 1Risk Register — Musica TowerRisk Register · manual · 24 pp · —
- Doc c079e516 · p. 1Toolbox Talk — Piling Exclusion Zone 14 Apr 2026Toolbox Talk · manual · 3 pp · —
- Doc af9493d1 · p. 1SWMS — Secant Piling Rev3 (Musica Tower)SWMS · manual · 22 pp · —