Projects/8bed6206-e219-46e8-b9b4-88427888c37a
NCX-D-003 · GC21

North Connex Tunnel Finishing — Zone D

Transurban · Principal contractor: CPB Contractors · $19.2M

Project health
0/ 100
0
Verified
0
Partial
0
Unverified
0
Contradicted
Location
Wahroonga, NSW
Start → End
08 Nov 2025 → 30 Aug 2026
Days to next audit
0 days
Value
$19.2M
Standards
ISO 45001 · ISO 14001 · ISO 9001
Team
— (PM) · — (HSEQ)

Change control register

All formal changes to PMP commitments, SWMS, and operational procedures

No change records for this project.